2 result(s) for “GESTOCI”
The government, through the Minister of Mines, Oil and Energy, Mamadou Sangafowa Coulibaly, confirms the construction of a second refinery in San Pedro, a titanic project which should triple the national refining capacity before 2040 and propel the country to the rank of West African energy hub. It was in Yamoussoukro...
The Minister of Mines, Oil and Energy, Mamadou Sangafowa Coulibaly, commissioned the R14 tank with 20,000 m³ of diesel and the first Ivorian loading station for GESTOCI tank trucks, on July 24, 2026. This double infrastructure brings the total capacity of the depot to 100,700 m³.